Manufacturing overhead represents the costs for items that go into the production of many goods rather than just a few. A variable overhead efficiency variance represents a difference between budgeted overhead items and actual overhead items used in production. For example, indirect labor hours are a part of manufacturing overhead; a variable overhead efficiency variance occurs when the actual hours used in production are more or less than expected. Once managerial accountants discover the variance, they must determine whether the variance is favorable or not. Unfavorable variances are a sign of inefficient production methods or improper actions by production employees.

A flexible budget is typically the starting point for the discovery of variances in a company’s production system. This budget uses information from previous production periods in order to obtain a general standard. These standards represent the number of hours, materials, and other items needed to produce goods in the most efficient and effective way possible. From here, managerial accountants can use these standards for manufacturing overhead to estimate whether or not current production is on par with the general standards. In some cases, flexible budgets may be needed for different items produced or different manufacturing overhead pieces.

The computation of a variable overhead efficiency variance starts with the collection of data from the current production process. The data gathered must match that of the flexible budget; failure to collect the same information can lead to difficulties in computing the variance. For example, the number of indirect labor hours to complete the production process in the current period is compared to the flexible budget. A difference in standard hours versus actual hours can indicate if the company spent more or less hours completing a set of goods. More hours spent to produce the certain amount goods can indicate inefficient production activities.

Though a variable overhead efficiency variance may initially be seen as unfavorable, it may actually be favorable. For example, more hours spent at a lower cost may wind up saving the company money in the long run. Additionally, the opposite may be true if there is a variance that is fewer hours than the standard set in the flexible budget. Lower hours spent in order to save money can result in poor-quality products that wind up costing the company more money to replace or reproduce. Either way, the review of variances in a production environment can determine how a company may save money and improve a variable overhead efficiency variance.

This article is for information only and is not financial advice.

Key terms in this article

Related articles

  • What Are the Different Types of Variable Overhead Costs?

    Variable overhead costs are those cash payments that change at different levels of activity. Companies only have to pay these costs once they begin a…

  • What is Portfolio Variance?

    Portfolio variance is a process that identifies the degree of risk or volatility associated with an investment portfolio. The basic formula for…

  • What Is Cost Variance?

    A cost variance is the difference between actual and budgeted costs, which companies use to determine the efficiency of their operations. Variances can be…

  • What is Budget Variance?

    A budget, defined basically, is a strategic financial plan. It usually considers income and expenditures. In doing so, a number of other factors, such as…

  • What is a Variance Swap?

    A variance swap is a financial derivative product designed to allow professional investors to manage portfolio risk. It can be used to remove risk, or…